Ref. No. : 39372386   
Company Name : Can be viewed by Subscribers
Product Detail : Construction of Water & Sewerage Infrastructure In Luapula Province.
Water Supply Improvement Works in Mwense and Kawambwa (Luapula Province)- Lot 2,
1. Design & Construction of a new weir upstream on Mwense Stream and a gravity transmission line,
2. Construction of a conventional slow sand filters WTP (50 m3/hr - 1,200 m3/day capacity);
3. Minor repair works on the existing rapid modular plant and replacement of back wash tanks, valves, painting and pipework;
4. Supply & installation raw water gravity main from new intake pump house to new WTP & old WTP (9.6 km, ND 400 PVC);
5. Supply & installation treated water rising main from old WTP to Low Density new plots Elevated Tanks (0.8km, ND 150 DI);
6. Construction of the HL pump station at WTP to house 4 pumps);
7. Construction of a 1,000m3 clear well at the existing WTP to replace the existing one;
8. Construction of a 300m3 cold pressed steel panel tank at Low Density new plots;
9. Geotechnical investigations to confirm soil bearing capacity for proposed structures (to be undertaken by the Contractor as part of the works contract);
10. Replacement & extension of the water distribution network to new developmental areas (Matelo, Shingwe, Nsakulaba & Low Density new plots / Total 10 km of ND75 to ND 200 PVC) & Supply and Installation of bulk water meters (Total 10 no.);
11. Replacement of existing & installation of new water meters (Total 800 no. of Domestic & Non- Domestic, including service connections);
12. Construction of shared water taps in Matelo & Nsakaluba;
13. Installation of Telemetry system for the WTP & water tanks (Radio System);
14. Design & construction of new district office (single storey- floor area 190m2) for Luapula Water & Sewerage Company (LpWSC) in Mwense.
14. Existing Booster pump station at the WTP - Installation of 2 HL pumps (1D+1S) complete with motors for transmission to new Ntulo ET;
15. Supply & installation of a treated water rising main from WTP to Ntulo Tank (2.1 km, ND 100 DI);
16. Construction of a 500 m3 RC ground clear water tank & construction of 300 m3 cold pressed steel panel ET in Ntulo/Mutuna Village;
17. Replacement & extension of the water distribution network to new developmental areas (New Town, Part of Ntulo, Matelo & PWD area/ Total 33.5 km of ND75 to ND 200 PVC);
18. Supply & Installation of bulk water meters (Total 6 no.);
19. Replacement of existing & installation of new water meters (Total 970 no. of Domestic & Non- Domestic, including new service connections);
20. Construction of shared water taps in Matelo, Chadale & Ntulo/ Mutuna Village;
21. Installation of Telemetry system for the WTP and water tanks (Radio System);
22. Design & construction of new district office (single storey- floor area 190m2) for Luapula Water & Sewerage Company (LpWSC) in Kawambwa.
Tender Detail : The Government of the Republic of Zambia has received funding from the African Development Bank (AfDB), the African Development Fund, Middle Income Trust Funds and Africa Growth Together Fund, in various currencies towards the cost of the Integrated Small Towns Water Supply and Sanitation Program in Luapula Province.
Product Note : Bid security of USD 240,000.00.
Tender Location : Lusaka - Zambia
Document Path : Can be viewed by Subscribers
Tender Document Fees : ZMK 1000
Tender Closing Date : 30/06/2020 at 00:00 Hrs.
Tender Opening Date : 30/06/2020 at 00:00 Hrs.
Address : Can be viewed by Subscribers
Sub-Industry/Industry : Water Storage and Supply - Construction   
 Login/Register
Members/Visitors Login to continue
 Email Id:
 Password:


 Forgot Password?