Construction of the 225/33 Kv Source substation at Yopougon 3, the 225 Kv Line for connection to the Pk 24 substation & the restructuring of the HTA / BT Networks, 1) Work to create the 225/33 KV substation at Yopougon 3 & Extension of the Akoupe Zeudji substation, 2) Construction work on the 225 KV Akoupe Zeudji Pk24- Yopougon 3 line, 3) HTA restructuring works Construction of reflection stations, H59 stations & LV/ EP aerial network, 4) MV Restructuring Work Creation of underground MV & fiber optic networks, 5) Remote transmission & telecontrol system.
|