Product Detail :
|
Distribution network construction work as part of the irrigation development project and adaptation of irrigated agriculture to climate change, in 2 lots - Lot 1 realization of the disc shutter, the storage and the first section of the distribution pipe from pk 00 to pk 9.75 including antenna (at1, cs1 and cs2), installation and equipment of its terminals. -lot 2 construction of the second section of the distribution pipe from pk 9.75 to pk 34.9 including antennas (cs5 and cs6), installation and equipment of terminals for traditional perimeters.
|
Tender Detail : |
For more information please refer the tender notice. |