Product Detail :
|
Distribution network construction work as part of the irrigation development and adaptation of irrigated agriculture to climate change project, in 2 lots - lot1 realization of the disc shutter, the storage basin and the first section of the distribution pipe from pk 00 to pk 9.75 comprising antenna (at1, cs1 and cs2), installation and equipment of its terminals. - lot2 construction of the second section of the distribution pipe from kp 9.75 to kp 34.9 including antennas (cs5 and cs6), installation and equipment of the traditional perimeter terminals.
|
Tender Detail : |
Please refer tender notice/documents for more details. |