Product Detail :
|
Construction of ezulwini sustainable water supply system (package a). ?potable water storage reservoir 15ml circular post tensioned
concrete reservoir at ezulwini. ?completion of treated water gravity mains ( 640m of dn 500 ductile iron pipes of which 960m has already been laid. total length of pipeline is 1.6km). access road to reservoir. break pressure tank (100m3) and pressure reducing valves.
|
Tender Detail : |
Please refer tender notice/documents for more details. |