Product Detail :
|
Provision Of Owner Supervision Service During The Construction And Warranty Period Of Rail Baltica~s Upper Railway Infrastructure
|
Tender Detail : |
Contract notice: provision of owner supervision service during the construction and warranty period of rail balticas upper railway infrastructure
The contracting authority intends to build an international rail terminal with rail infrastructure instead of the upper railway station. the passenger terminal is intended to serve passenger rolling stock used on rail baltica 1435 mm and estonian railway 1520 gauge lines as a stop for both high-speed and local trains. together with the construction of the passenger terminal, it is necessary to rebuild the 1520 gauge railway infrastructure in the upper part and the technical networks and facilities in its areas. owner supervision service during construction works and the warranty period pursuant to the building code and regulation no. 80 of the minister of economic affairs and infrastructure of 2 july 2015 procedure for performing owner supervision .The contracting authority intends to build an international rail terminal with rail infrastructure instead of the upper railway station. the passenger terminal is intended to serve passenger rolling stock used on rail baltica 1435 mm and estonian railway 1520 gauge lines as a stop for both high-speed and local trains. together with the construction of the passenger terminal, it is necessary to rebuild the 1520 gauge railway infrastructure in the upper part and the technical networks and facilities in its areas. owner supervision service during construction works and the warranty period pursuant to the building code and regulation no. 80 of the minister of economic affairs and infrastructure of 2 july 2015 procedure for performing owner supervision .
|