Product Detail :
|
400-09 Lightning Protection | General Renovation And Extension Of The Indoor Pool In Leipheim
|
Tender Detail : |
Contract notice: 400-09 lightning protection | general renovation and extension of the indoor pool in leipheim
The indoor pool in leipheim was built in the early 1970s and has been in operation since then. in the years 1997-1999 and 2002 there were partial renovations and extensions (sauna, small childrens area). the aim of the general renovation should be a "family-oriented sports pool with sauna". the water areas are to remain in their current size, the small childrens area, the sauna and the outdoor area are to be revised to make them more attractive. in particular, the technical equipment and bathing water technology no longer meets todays requirements and must be adapted to current standards.Setting up an external lightning protection system with connection to an earthing system set up by another trade. approx. 2000m air-termination lines, approx. 20 air-termination rods. including testing and documentation of the system.
|