Product Detail :
|
The work to connect the STEP to the 400 kV network , which consists of a drawdown of one line of the 400 kV Oualili-Bourdim line to the STEP El Menzel substation by means of the construction of a 400 kV line with two lines approximately 30 km long.
|
Tender Detail : |
General Procurement Notice : Execution studies (civil engineering and equipment)
Project Name : El Menzel Pumped Storage Energy Transfer Station (PSE)
last Date of Submission 29 December 2025 |